
Hyperscalers building AI data centers are competing directly with grid operators for the same physical components — including large power transformers that now require 2-3 years to procure (they took weeks before 2020).
This ATRILLIONDOORS episode covers the full picture: the grid aging crisis, the commodity supply chain vulnerabilities, and the transformation pathways (flexible load management, fusion investment, enhanced geothermal) that make the light assembly case.
WATCH:https://youtu.be/oqdLYUpBOsM
Source: Top_Draft_9546
1 Comment
This is how you get people to decentralize their energy consumption and production.